BLOG

Migrating PMS without losing bookings: a step-by-step checklist

A checklist for migrating PMS without losing bookings or owner balances: preparation, data migration, channel connection and switchover day.

Tell us about your project

Changing PMS is daunting for a specific reason: for a few days two systems coexist, channels keep selling and any mismatch can lead to duplicate bookings, incorrect owner balances or guests without access. The good news is that a well-planned migration can be done without losing bookings. The key is preparing the data beforehand, setting a cut-off day and checking every step against checklists.

This is the checklist we use with our clients, adaptable to any portfolio size.

Phase 1: preparation (4 to 8 weeks before)

  • Choose the cut-off date. Avoid high season, bank holidays and month-ends with accounting close.
  • Appoint a migration lead and a backup. One person with authority to decide.
  • Inventory what needs to be migrated: homes and their features, rates and rules, future bookings, guests, owners and contracts, outstanding balances, message templates, integrations.
  • Clean the data in the current system: duplicate homes, owners without tax details, old bookings left open. What migrates dirty arrives dirty.
  • Check with the new vendor what imports automatically and what must be loaded by hand.
  • Review your contracts with channels and the current vendor: notice periods and access to data after cancellation.

Phase 2: configuring the new system

  • Set up homes, rates, minimum stays and cancellation policies.
  • Set up owners, commissions and the statement model. Run a test statement with a real month's data and compare it with the previous system.
  • Prepare the integrations: locks, online check-in, dynamic pricing, cleaning, payments and accounting.
  • Train the team with real cases before the switch, not after.

Phase 3: data migration

  • Import future bookings with all their data: amounts, payments received, channel, guest and notes.
  • Reconcile the totals: number of bookings and sum of amounts per home and per month in both systems. If they do not match, do not move on.
  • Migrate owner balances at the cut-off date and document each owner's opening balance.
  • Keep a full export of the previous system: it is your backup and your reference for disputes.

Phase 4: switchover day

  1. Freeze manual changes in the old system at a set time.
  2. Disconnect channels from the old system and connect them to the new one, one by one, checking availability and prices for each home.
  3. Check that bookings arriving during the switch appear in the new system. Keep each portal's extranet at hand.
  4. Check the calendars for the next two weeks home by home.
  5. Verify that access codes and automated messages for imminent arrivals work.

Phase 5: the following two weeks

  • Daily review of new bookings, cancellations and changes in channels and PMS.
  • Track incidents in a single log, with an owner and a date.
  • First owner statement with a double check against the old system's data.
  • Keep read-only access to the old system until the first month is closed.

The mistakes that cause problems

  • Migrating in high season because of calendar pressure.
  • Connecting all channels at once without checking each home.
  • Not reconciling amounts and accepting the import as correct.
  • Forgetting owner balances and discovering the gap in the first statement.
  • Training the team on switchover day.

An example

A property manager with 120 homes in two destinations needed to change PMS because its system did not handle owner statements well. We set the cut-off in low season, cleaned data for three weeks, ran two test statements and connected channels by destination on two different days. First-week incidents were resolved from a single log and the first statement matched the previous system's.

Frequently asked questions

How long does a PMS migration take?

It depends on the number of homes, the integrations and the quality of the data. With preparation, the switch itself takes one or a few days; the preparation is what takes weeks.

Can bookings be lost when changing PMS?

The risk exists if channels are connected without checks or imported bookings are not reconciled. With reconciled totals, a phased connection and daily reviews in the first weeks, the risk drops considerably.

What happens to owner balances?

They are migrated at the cut-off date as opening balances and documented. The first statement in the new system should be double-checked.

Changing PMS?

At Master VR we plan and support the PMS change from start to finish, with checklists, testing and support on switchover day. Tell us about your situation.

Tell us about your project